We know that during the operation of the stenter setting machine, it is necessary to reasonably control three important process requirements, namely temperature, time and pressure. In the stenter drying room, if it is found that the insulation layer of the drying room needs to be replaced or scrapped, the insulation material filled in it should be disposed of or destroyed according to the relevant local environmental protection regulations. As for the temperature control of the drying room, the process temperature is mainly set through the up and down keys on the temperature control table.
There are also corresponding burners in the tenter drying room of the stenter setting machine equipment, which mainly play the role of heating the drying room. The temperature control instrument controls the size of the flame to control the temperature. Contactor control logic start and stop. The operation steps of the burner are: first turn on the circulation fan, then turn on the key switch of the burner to allow the burner to work; and turn on the main engine to keep the vehicle speed above 5m/min; then set the process temperature on the temperature control table. The burner is finished.
The next step is to enter the air-cooling link of the cloth, mainly to realize the requirement of rapid cooling of the fabric. As for the tail box of the stenter setting machine, the main operations include: adjust the needle-off position, and put down the roller when the cloth passes through the tail of the machine; set the process parameters on the man-machine interface ( Main engine speed); turn on the main engine, run the cloth padding car at the tail of the machine; check the lubricating oil quality and oil quantity of the transmission box of the main engine according to the regulations, and lubricate the amplitude adjustment screw rod at the tail of the machine according to the regulations.
https://www.sunwinmachinery.com/






