Home > Knowledge > Content

Operation points of stenting and setting machine

Sep 02, 2020

There are many problems in the operation of the stenter. As users, we should not only carry out inspection and maintenance according to the specifications, but also master the correct operation methods and keep in mind the precautions. Only in this way can the operation of the stretcher equipment be more stable and safe.

 

In the operation of the machine, if you need to adjust the full width of the machine, then the transmission part of the machine should first rotate to check whether it is normal. Under normal conditions, then adjust the full width to the required width, use the edge to adjust, and adjust the feed to a predetermined value.

 

It should be noted that in order to ensure the good operation of the pull rod, workers need to regularly lubricate and maintain the width adjustment device, and carefully check whether the transmission system of the door width adjustment device is normal. Generally, the width control system should be tested and adjusted within one month, or adjusted appropriately.


Send Inquiry