1. Before starting the machine, check whether the mechanical, electrical, instrumentation and safety protection devices are in good condition. Set the temperature according to the process requirements, and then turn on the circulating fan. In the heating stage, the speed of the main engine is 15m/min, and the cloth can be loaded only when the set temperature is reached. Open the active brush wheel after meeting the requirements of the upper cloth, press the cloth on the needle plate, try to make both sides even, put down the passive brush wheel at the same time, and tighten the fabric. When starting the main unit, you should ring the bell to notify the operator at the rear of the car. When the cloth reaches the rear of the car, the cloth should be put on at the fastest speed and the fabric should be tightened.
2. The safety protection cover at the cloth entry and exit points of the machine should be in good condition to prevent the clips from hooking on the sleeves, and at the same time, it can also prevent the chain from breaking and flying out and hurting people.
3. The rolling car rope pulls the emergency stop switch and the cloth feeding safety handle, which is reliable and useful. When the cloth is operated, it must be stopped and the upper roller should be lifted by pressing. Do not be negligent.
4. The grey fabric must be sewn, and no knots are allowed, so as not to damage the rubber roller and cause an accident.
https://www.sunwinmachinery.com/






